"Sfera-1000" - machine for frameless construction!

See

FOR WHAT PURPOSES IS THE EQUIPMENT "Sfera" AND "Sfera-1000" USUALLY PURCHASED:

Organization of a profitable construction business

1

High demand for frameless buildings

Thanks to the favorable price and high speed of construction of frameless structures.'

2

Ability to build 12 months a year

The equipment and production technology allow you to work in almost any weather conditions.

3

You will get a stable source of income

Usually, the profit is up to 30% of the cost of the construction contract.

4

You can work anywhere in the world

The mobility of equipment and the prevalence of raw materials do not limit you geographically.

5

By purchasing equipment "Sfera" or "Sfera-1000", you get a ready-made construction business. You will only have to bring the machine to the construction site and buy metal.

Purchase of a machine for the construction of your company's infrastructure

1

Speed of construction

Construction of a 1000 m2 building in just 10 days! 5 people are enough for construction.

2

The service life of buildings is up to 50 years

The tightness of the structure and the corrosion resistance of the metal minimize maintenance costs.

3

The maximum savings in the construction of

Buildings built using frameless technology have a record low cost.

4

No skilled workers required

All the process is automated and does not require workers in the construction of education

5

By purchasing equipment "Sfera" or "Sfera-1000", you can save on the construction of new buildings or organize a parallel construction business.

What can be built with the equipment
"Sfera" and "Sfera-1000"

Industrial warehouses
Industrial warehouses
Industrial facilities of various functions;
Industrial facilities of various functions;
Sports facilities
Sports facilities
Various amenities
Various amenities
Construction of attic floors
Construction of attic floors
Aviation hangars
Aviation hangars
Workshops, repair shops; garages
Workshops, repair shops; garages
Car dealerships
Car dealerships
Garages
Garages
Grain elevators, vegetable storehouses
Grain elevators, vegetable storehouses
Cattle-breeding complexes
Cattle-breeding complexes

And other options

Advantages of working with equipment
"Sfera" and "Sfera-1000"<

How does "Sfera" and "Sfera-1000" build?

Stages of construction of a pre-fabricated building using the "Sfera" equipment on the example of the construction of a hangar with an area of 1000 sq. m.:

Delivery and installation of equipment "Sfera" on the construction site

The equipment "Sfera" in the assembled form is loaded by truck crane on vehicles with dimensions (length from 9 and width from 2.3 meters) and load capacity (not less than 7.5 tons) and transported directly to the construction site.

The equipment is leveled with the help of jacks built into it along the horizontal plane (level) and installed on this rectangle in such a way that the selected dimensions are sufficient to accommodate the reception tables of straight and arched panels.

Delivery and installation of equipment "Sfera" on the construction site

Laying the foundation – 1 day

The low weight of the structure allows you to do without laying powerful foundations, which greatly simplifies, accelerates and reduces the cost of the construction process.

Usually use a light ribbon foundation or screw piles. This foundation is sufficient for the stability of the building for the entire service life. during the construction of a building with an area of 1000 sq. m. the installation and stitching of arch sections takes 5 days. installation of screw piles for the construction of a hangar of 1000 sq. m. takes 1 working day.

Laying the foundation – 1 day

Production of arched panels – 2 days

To form the load-bearing arched panels that will form the basis of the future building, the "Sfera" is delivered by car to the construction site.

The equipment automatically produces arches that meet building standards. The raw material is a common rolled metal. Ready-made arches are quickly and easily sewn together, in sections of 5 pieces, with a special seaming machine, forming sealed seams. This allows you to save on connecting fasteners and waterproofing.

Production of arched panels – 2 days

Installation of arched panels – 5 days

The low weight of the structure allows you to do without laying powerful foundations, which greatly simplifies, accelerates and reduces the cost of the construction process.

Usually use a light ribbon foundation or screw piles. This foundation is sufficient for the stability of the building for the entire service life. during the construction of a building with an area of 1000 sq. m. the installation and stitching of arch sections takes 5 days. installation of screw piles for the construction of a hangar of 1000 sq. m. takes 1 working day.

Installation of arched panels – 5 days

Insulated version

To form the load-bearing arched panels that will form the basis of the future building, the "Sfera" is delivered by car to the construction site.

The equipment automatically produces arches that meet building standards. The raw material is a common rolled metal. Ready-made arches are quickly and easily sewn together, in sections of 5 pieces, with a special seaming machine, forming sealed seams. This allows you to save on connecting fasteners and waterproofing.

Insulated version

Installation of end walls and gates – 2 days

The low weight of the structure allows you to do without laying powerful foundations, which greatly simplifies, accelerates and reduces the cost of the construction process.

Usually use a light ribbon foundation or screw piles. This foundation is sufficient for the stability of the building for the entire service life. during the construction of a building with an area of 1000 sq. m. the installation and stitching of arch sections takes 5 days. installation of screw piles for the construction of a hangar of 1000 sq. m. takes 1 working day.

Installation of end walls and gates – 2 days

Interior finishing works

To form the load-bearing arched panels that will form the basis of the future building, the "Sfera" is delivered by car to the construction site.

The building with an area of 1000 sq. m. is being built in just 10 days. At the same time, the simplicity of the operations performed does not require special construction education from employees. For construction, you will need five workers.

Interior finishing works
1
1
2
2
3
3
4
4
5
5
6
6
7
7

Construction of buildings from straight profiles

The profile obtained on the machine "Sfera" is a universal building material, in addition to frameless arch construction, it can be used for:

1

Для облицовки каркасных зданий

2

Для заделки торцевых стен бескаркасных зданий

Machine Sfera -1000

Machine Sfera -1000
  • "Sfera-1000 - an improved version of the machine "Sfera", which has retained all the best of the prototype: reliability, endurance and ease of use.
  • The different shape of the profile provided an increase in the load-bearing capacity of the structure and 25% metal savings compared to the Sfera
  • Higher speed of construction of buildings due to a wider profile.

Comparison of machine profiles "Sfera" and "Sfera -1000"

Profile " Sfera»

Profile " Sfera»

Profile "Sfera-1000"

Profile "Sfera-1000"

Technical specifications:

«Sfera» «Sfera» – 1000
Workpiece: coiled galvanized steel. Steel type: 08 ПС, GOST 14918-80 width, mm 600-605 1000
thickness, mm 0,8...1,5 0,8...1,5
coil internal diameter, mm 500...600 500...600
maximum roll weight, kg 4000 8000
Rolling mill drive power, kw 4,0 11
Drive power of the bending machine, kw 4,0+1,5 7
Electric stove drive power, kw 1,1 1,9
Closing machine’s drive power, kw 0,75 0,75
Maximum power used by equipment, kw 5,5 20
Weight of closing machine, kg 25 27
Dimensions, mm length 7600 7900
width 2200 2400
height 2000 2300
Span, m 6 ...24 15 ... 30
Unit weight (kg) 6000 8000

Equipment configuration

№ p/p Name «Sfera» «Sfera» – 1000
1 Platform with jacks (6 pieces) 1 1
2 Rolling mill 1 1
3 Bending mill 1 1
4 Decoiling machines 1 1
5 Straight panel receiving tray 12 10
6 Arch receiving tray 8 8
7 Receiving tray 1 1
8 Electric cabinet with remote control 1 1
9 Folding (seaming) machine машина 2 1
10 380/36 V transformer 1 1
11 Cross piece for lifting arches 1 1
12 PVC tent* 1 1

*PVC tent is designed to protect the equipment "Sphere" from mechanical damage during transportation and storage. Overall dimensions of the awning: 8000x2800x2500 mm.

Economic calculations of the cost of construction

Construction costs of a building of 1000 sq. m. with the help of equipment "Sfera"*

№ p/p weight (tons) Price, rubles per ton Total cost
Rolled galvanized steel 605*1.2 mm 37,39 t. 54864 rub 2051365 rub.
Corner 100*100*7 mm 1,562 t. 37300 rub 58263 rub.
Profile pipe for the supports of the gate 26 m/p. (100*100*4 mm) 0,305 t. 39500 rub 12048 rub.
Hardware (approximately) - - 12000 rub.
Total 2133676 rub.
Price per sq. m. 2133,7 rub.

*The prices of the foundation and wages in each case are individual and are not taken into account in the calculations.

Construction costs of a building of 1000 sq. m. with the help of equipment "Sfera" *

№ p/p Weight (tons)) Price, rubles per ton
Total cost
Rolled galvanized steel 605*1.2 mm 29,98 t. 54864 rub. 1644223 rub.
Corner 100*100*7 mm 1,562 t. 37300 rub. 58263 rub.
Profile pipe for the supports of the gate 26 m/p. (100*100*4 mm) 0,305 t. 39500 rub. 12048 rub.
Hardware (approximately) - - 12000 rub.
Total 1726534 rub.
Price per sq. m. 1726,5 rub.

*The prices of the foundation and wages in each case are individual and are not taken into account in the calculations.

CUSTOMER FEEDBACK

All feedbacks

Advantages of cooperation

Free training on working with machines

We conduct training on the basis of our company, which allows you to start construction in the shortest possible time. the simplicity of operations will allow your employees to master the equipment in two to three days.

Construction under the supervision of our specialists

At your request, our specialist can come to the construction site to train workers and control the construction process. He will also tell you about the nuances of construction and teach you how to carry out maintenance.

Technical support throughout the entire service life

Specialists of the service department will provide qualified assistance in explaining the operation of the equipment, troubleshooting, maintenance, as well as warranty and post-warranty repairs.

High quality equipment

Components are manufactured on CNC machines, which ensures high quality of each part and eliminates possible errors in production. Each machine passes a test cycle before shipment.

We deliver the equipment to any point of the globe

All responsibility for the safety of the equipment, the timeliness of its delivery and the solution of customs clearance issues, the company "Azhurstal" assumes.

We provide a long-term guarantee

Highly qualified staff is ready to carry out adjustment, prevention, assistance in solving any issues that arise in the shortest possible time.

Regular equipment upgrades

"Sfera" has been produced since 2007. all this time, our own design department makes timely improvements and improvements to the design of the equipment, making the equipment more reliable and convenient.

Possibility of leasing purchase

With the help of leasing programs, you can already use the equipment that your competitors will be able to buy only tomorrow.

All equipment is protected by patents and certified

The company "Azhurstal" has a certificate of compliance with ISO 9001, which confirms the high-quality performance of the organization's work at the level of world standards. All equipment is protected by Rospatent patents.

SUBMIT AN APPLICATION

If you need expert advice, we will be happy to answer your questions by phone:
8-800-550-07-90 or +7 (351) 220-55-00